Defence Medical Rehabilitation Centre, Headley Court



01 About the Project

About the Project

Client: Ministry of Defence

Sector: MoD

Location: Headley, U.K.

Headley Court provides care and rehabilitation for service personnel returning from active service worldwide. Most have seen action in Afghanistan and Iraq and have suffered serious injuries often resulting in amputation.

Amber Management were appointed to provide full design services for the mechanical and electrical services for the new Help for Heroes Rehabilitation Complex at Headley Court.


02 Project Requirements

Project Requirements

This facility incorporates a state of the art Ozone Pool with movable floors and swim jets to provide an incredibly flexible and versatile pool experience. Associated with the pool complex are a full Multi Purpose Gymnasium, Cardio Vascular Suites, Assessment Suites and Physiotherapy Department.

The facility is constructed in an area with Grade 2 Listed buildings and gardens noted “As of Particular Importance”. The planning requirement to overcome a number of objections required very low profile solutions.

A condition of the LPA was that the facility was designed to BREEAM Very Good standard. This rating was achieved by incorporating low energy technology and sustainable solutions to the mechanical and electrical services.


03 Contact Us

Looking to specify your own project

Whether you’re looking for innovative Building Information Modelling (BIM) or the full design of mechanical, electrical, data, telecoms and public health works, Amber Management & Engineering Services have the knowledge and technical capability to complete your project to the highest standard.

With almost 30 years’ of experience in the Mechanical & Electrical sectors, you know you can rely on our skilled team to provide sustainable and creative engineering solutions that stand the test of time.

Request a Quote
Our Services